Groundbreak.

Pinnacle Lakeside Under Construction at 215 Lake Shore Blvd E

Pinnacle International's 1,261-unit Pinnacle Lakeside is under construction at 215 Lake Shore Blvd E on Toronto's waterfront, where the 15-storey building has topped out and the taller towers are still rising.

Rendering of the Pinnacle Lakeside community at 215 Lake Shore Blvd E, Toronto
Rendering of the Pinnacle Lakeside community at 215 Lake Shore Blvd E, Toronto© Hariri Pontarini Architects / Greenland Group

Pinnacle Lakeside Phase 1, a 1,261-unit condo development, is under construction at 215 Lake Shore Blvd E on Toronto's waterfront. A building permit covers the first 591 units. Pinnacle International is developing, with Hariri Pontarini Architects designing.

Phase 1 comprises three towers of 15, 44, and 54 storeys, topping out at 574 ft (174.86 m). The 1,450,000 sq ft project sits on a 3.8-acre site with over 30,000 sq ft of retail frontage along Lower Sherbourne. Suites break down as 766 one-bedroom, 325 two-bedroom, and 170 three-bedroom.

As of June, 2026, the 15-storey building has topped out while the 44- and 54-storey towers continue to climb.

The site sits near the Gardiner Expressway, Union Station, and the future Waterfront East LRT. A Phase 2 proposal calls for 70-, 60-, and 14-storey towers with 1,390 units, including 180 affordable units.

The project file
Pinnacle Lakeside (Phase 1)Under Construction
Open the file ↗
Address
215 Lake Shore Blvd E, Toronto, ON M5A 3W9
Units
1,261
Floors
54
Height
574 ft
Sq ft
1,450,000
Completion
2027

Every filing, company, change and story we have on this project, under construction as of our latest read of the record.

The Toronto Brief · free

Every new Toronto project, in your inbox at 8.

Read from the permits and filings each morning and written up as news. Free.

Free · unsubscribe anytime · no spam, just projects

Groundbreak covers 9 markets

  1. 1

    SkyTower at Pinnacle One Yonge Tops Out, First Move-Ins Due This Fall

  2. 2

    1,360-Unit Three-Tower Condo Plan Appealed for 1774 Ellesmere

  3. 3

    Site Plan Filed for 544-Unit Tower at 135 St Clair Ave W

  4. 4

    Toronto Major Streets Rezoning Now Permits Six-Storey Midrise

  5. 5

    College Park Redevelopment Approved at Yonge and College

More from Toronto

All coverage ↗