Groundbreak.

Grace Apartments Secures Bridge Loan for Midtown Lease-Up

Broadshore Capital Partners closed a floating-rate senior bridge loan on the 383-unit Grace Apartments at 1815 Church Street, delivered in August 2025.

Site of Grace Apartments (19th & Church) at 1815 Church Street, Nashville, TN 37203
Site of Grace Apartments (19th & Church) at 1815 Church Street, Nashville, TN 37203Satellite imagery © Mapbox, © Maxar · site map by Groundbreak

Grace Apartments, a 383-unit, 16-story mixed-use tower at 1815 Church Street in Midtown, delivered in August 2025. The 175-foot building was developed by 19th Church Street LLC, a joint venture of Ascend Real Estate Group and Wanxiang America Real Estate Group. Smith Gee Studio designed the project; Yates Construction was general contractor.

The tower includes a controlled-access parking garage and approximately 6,000 square feet of ground-floor retail. JLL arranged the $133.6 million construction loan through Square Mile Capital Management. In September 2026, Broadshore Capital Partners closed a floating-rate senior bridge loan to support lease-up and stabilization; Berkadia brokered the deal.

Amenities include a resort-style pool with sundeck and cabanas, a sky lounge with outdoor terrace, a fitness center with yoga and Pilates studio, a private dog run, a coffee bar, a chef's kitchen, a music and podcast studio, an outdoor bar, a courtyard with grilling stations and firepits, and private work rooms.

Address
1815 Church Street, Nashville, TN 37203
Units
383
Floors
16
Height
175 ft
Sq ft
400,000
Completion
Aug 2025

Every filing, company, change and story we have on this project, completed as of our latest read of the record.

The Nashville Brief · free

Every new Nashville project, in your inbox at 8.

Read from the permits and filings each morning and written up as news. Free.

Free · unsubscribe anytime · no spam, just projects

Groundbreak covers 8 markets

  1. 1

    Oracle's 1.3M SF East Bank HQ Campus Under Construction

  2. 2

    600-Room Hotel Proposed for East Bank's Eastpoint Development

  3. 3

    Oracle's 2M sq ft Campus Rises in Nashville

  4. 4

    Second Harvest Breaks Ground on Donelson Pike Headquarters

  5. 5

    Demonbreun Hill Phase I Approved at 118 16th Ave. S.

More from Nashville

All coverage ↗