Groundbreak.

Oracle Pedestrian Bridge Proposed Across Cumberland River

Oracle America proposes a 75-foot-tall pedestrian bridge over the Cumberland River, linking the East Bank to Germantown, with design by Foster + Partners.

Oracle Releases Renderings of Proposed Pedestrian Bridge | Pith in the Wind  | Nashville News | nashvillescene.com
Oracle Releases Renderings of Proposed Pedestrian Bridge | Pith in the Wind | Nashville News | nashvillescene.comRendering via Oracle

The River North Pedestrian Bridge, also known as the Oracle Pedestrian Bridge, would cross the Cumberland River from River North Boulevard and Cowan Street on the East Bank to Adams and Taylor Streets in Germantown. Oracle America, Inc. is developing the project, with design by Foster + Partners.

The 75-foot-tall bridge will serve bicycles and pedestrians, with a pavilion at the west landing and restaurant space at the Germantown landing. It will connect to the Cumberland River Greenway.

Oracle shares renderings of pedestrian bridge to Nashville's East Bank
Oracle shares renderings of pedestrian bridge to Nashville's East BankRendering courtesy Oracle

The project remains in the proposed stage, with completion expected December 31, 2028—revised from a previously reported August 2028.

The crossing would link Germantown directly to the East Bank, where Oracle is building its Nashville campus. The East Bank landing sits along River North Boulevard, a corridor central to the broader East Bank redevelopment effort.

Address
Cumberland River crossing from River North Blvd & Cowan St (East Bank) to Adams & Taylor St (Germantown), Nashville, TN
Height
75 ft
Completion
2028

Every filing, company, change and story we have on this project, proposed as of our latest read of the record.

The Nashville Brief · free

Every new Nashville project, in your inbox at 8.

Read from the permits and filings each morning and written up as news. Free.

Free · unsubscribe anytime · no spam, just projects

Groundbreak covers 8 markets

  1. 1

    Oracle's 1.3M SF East Bank HQ Campus Under Construction

  2. 2

    600-Room Hotel Proposed for East Bank's Eastpoint Development

  3. 3

    Demonbreun Hill Phase I Approved at 118 16th Ave. S.

  4. 4

    Oracle's 2M sq ft Campus Rises in Nashville

  5. 5

    Ritz-Carlton Hotel and Condo Tower Proposed for the Gulch

More from Nashville

All coverage ↗