Groundbreak.

37-Story, 600-Room Hotel Proposed for Eastpoint on East Bank

The Fallon Company has proposed a 600-room, 37-story hotel at Parcel C1 in Eastpoint on Nashville's East Bank, with design by HKS and a 2030 opening target.

Site of Eastpoint Hotel (Parcel C1) at East Bank near new Nissan Stadium, Nashville, TN
Site of Eastpoint Hotel (Parcel C1) at East Bank near new Nissan Stadium, Nashville, TNSatellite imagery © Mapbox, © Maxar · site map by Groundbreak

The Fallon Company has proposed a 600-room hotel at Parcel C1 at Eastpoint on Nashville's East Bank, next to the new Nissan Stadium, with architecture by HKS. The 37-story, 475-foot tower's design has been released and next goes to the East Bank Design Review Committee for approval.

Site of Eastpoint Hotel (Parcel C1) at East Bank near new Nissan Stadium, Nashville, TN
Site of Eastpoint Hotel (Parcel C1) at East Bank near new Nissan Stadium, Nashville, TNSatellite imagery © Mapbox, © Maxar · site map by Groundbreak

The hotel would include 75 suites and rank as the third-largest hotel in downtown Nashville. Plans call for 35,000 square feet of event space, 20,000 square feet of retail, a fourth-level outdoor pool terrace, and a top-floor food and beverage concept. Three levels of underground parking would provide about 500 spaces. It is one of only three hotels permitted in the Initial Development Area south of the stadium. The brand, described as a public company, has not been announced.

Rendering of the Eastpoint hotel entrance and porte-cochère on Parcel C1
Rendering of the Eastpoint hotel entrance and porte-cochère on Parcel C1Rendering courtesy of The Fallon Company

Construction is set to begin October 2027 and run roughly 36 months, targeting a December 2030 opening, after the 2030 Super Bowl in Nashville. The tower would be the second building at Eastpoint, following Eastpoint Flats, which broke ground in May with 323 affordable units.

Site of Eastpoint Hotel (Parcel C1) at East Bank near new Nissan Stadium, Nashville, TN
Site of Eastpoint Hotel (Parcel C1) at East Bank near new Nissan Stadium, Nashville, TNSatellite imagery © Mapbox, © Maxar · site map by Groundbreak
Address
Parcel C1, Eastpoint, East Bank, Nashville, TN
Floors
37
Height
475 ft
Completion
2030

Every filing, company, change and story we have on this project, proposed as of our latest read of the record.

The Nashville Brief · free

Every new Nashville project, in your inbox at 8.

Read from the permits and filings each morning and written up as news. Free.

Free · unsubscribe anytime · no spam, just projects

Groundbreak covers 8 markets

  1. 1

    Cortland Buys Middle Eight Site in Franklin for $31.4M

  2. 2

    Oracle's 1.3M SF East Bank HQ Campus Under Construction

  3. 3

    Second Harvest Breaks Ground on Donelson Pike Headquarters

  4. 4

    Fifth Third Center Hotel Conversion Underway in Downtown Nashville

  5. 5

    270-Unit Apartment Building Proposed at 800 6th Ave S in PieTown

More from Nashville

All coverage ↗