TGH's 565K SF Taneja Tower Rises on Davis Islands, Opening 2028
Tampa General Hospital's 13-story, 565,000-square-foot Taneja Surgical, Neuroscience & Transplant Tower topped out in April on Davis Islands, with opening set for 2028.

The Taneja Surgical, Neuroscience & Transplant Tower is under construction at 1 Tampa General Circle on Tampa General Hospital's Davis Islands campus. The 13-story tower (plaza level plus 12 floors) totals approximately 565,000 square feet, the largest single building in TGH's history. TGH is the developer, with Gresham Smith on the design team.
The tower includes 144 patient beds and 31 operating suites with expanded ICU capacity, plus two shelled floors held for 72 future patient rooms. Facilities include an intraoperative MRI suite, robotics-ready operating environments, a Sterile Processing Department serving the campus, and a Central Energy Plant. The project also includes education and training space for the USF Health Morsani College of Medicine, a café, and two rooftop helipads on the Bayshore Pavilion. A two-story pedestrian bridge connects the tower to the existing hospital.
The project broke ground April 15, 2024, topped out in April 2026, and is expected to open in 2028. The tower was reported at $520 million at groundbreaking and is the flagship of TGH's $550 million Master Facility Plan. Gilbane Building Company is general contractor; Northstar Management is program manager and owner's representative. The design team also includes Alphonso Architects, Walter P Moore Structural Engineers, and Stantec Civil Engineers.
The tower is named for the Taneja family following a gift from the Taneja Family Foundation.
Correction, Oct. 21, 2026: An earlier version of this story said the tower's cost had risen to $550 million and gave 32 operating suites. The $550 million covers TGH's Master Facility Plan, the tower was put at $520 million, and TGH now lists 31 operating suites.
- Address
- 1 Tampa General Circle, Tampa, FL 33606
- Floors
- 13
- Sq ft
- 565,000
- Completion
- 2028
Every filing, company, change and story we have on this project, under construction as of our latest read of the record.
Every new Tampa Bay project, in your inbox at 8.
Read from the permits and filings each morning and written up as news. Free.
Free · unsubscribe anytime · no spam, just projects
Groundbreak covers 9 markets
Popular this week in Tampa Bay
More from Tampa Bay
All coverage ↗
Clearwater Skilled Nursing Facility Sells for $27.8M

Kenneth City Nursing Facility Sells for $38.3M

Gulf Shore Care Center in Pinellas Park Sells for $44.5 Million

$56M African American Arts & Cultural Center Proposed for West Tampa

264-Unit Affordable Complex Under Construction in St. Petersburg



