Groundbreak.

Bayside Center Office Campus Sells for $18.7M in Clearwater

Bayside Center, a two-building Class A office campus on U.S. 19 N in Clearwater, sold for $18.7 million, or about $87 per square foot.

Site of Bayside Center at 17755 U.S. Hwy. 19 N, Clearwater, FL 33764
Site of Bayside Center at 17755 U.S. Hwy. 19 N, Clearwater, FL 33764Satellite imagery © Mapbox, © Maxar · site map by Groundbreak

Bayside Center, a two-building Class A office campus at 17755 U.S. Hwy. 19 N in Clearwater, sold for $18.7 million, or about $87 per square foot, in October 2026. The campus totals 214,854 square feet on more than 24 acres.

Building I, at 17755, is a three-story, 46,501-square-foot building built in 1987. Building II, at 17757, is a six-story, 168,762-square-foot building built in 1994. The campus includes a five-story parking garage with approximately 710 spaces and covered walkways.

Site of Bayside Center at 17755 U.S. Hwy. 19 N, Clearwater, FL 33764
Site of Bayside Center at 17755 U.S. Hwy. 19 N, Clearwater, FL 33764Satellite imagery © Mapbox, © Maxar · site map by Groundbreak

Amenities include a tenant conference room, on-site cafe, building and pylon signage, and on-site security and maintenance staff. The property is ENERGY STAR certified and anchored by Insurance Administrative Solutions and Sports Facilities Companies.

IP Capital Partners sold the property after acquiring it in 2018 for $16 million. Melrose Solomon was the buyer. Institutional Property Advisors, a Marcus & Millichap division, arranged the sale and acquisition financing.

The project file
Open the file ↗
Address
17755 U.S. Hwy. 19 N, Clearwater, FL 33764
Floors
6
Sq ft
214,854

Every filing, company, change and story we have on this project, completed as of our latest read of the record.

The Tampa Bay Brief · free

Every new Tampa Bay project, in your inbox at 8.

Read from the permits and filings each morning and written up as news. Free.

Free · unsubscribe anytime · no spam, just projects

Groundbreak covers 9 markets

  1. 1

    Lockheed Martin Plans 75K SF Oldsmar Industrial Building

  2. 2

    Hammer Haag Steel Campus Approved in Largo

  3. 3

    16-Story Tower at 446 4th St. South Withdrawn in St. Pete

  4. 4

    Coral Walk Student Housing Breaks Ground Near University of Tampa

  5. 5

    Ferguson Office Rises at Gasworx, Fully Leased Ahead of Delivery

More from Tampa Bay

All coverage ↗