Projects
Development projects in Austin, sorted by most recently updated
| Project Name | Status | Type | Units | Floors | Square Feet | Completion Year | Construction Cost | Address | Last Updated |
|---|---|---|---|---|---|---|---|---|---|
| 1000 Red River Rezoning / 1001 Trinity Block Redevelopment | approved | rezoning | — | — | — | — | — | 1001 Trinity Street; 416½ & 502½ East 10th Street; 1000, 1001½, 1018 & 1020 Red River Street; 503, 505, 509½ & 516½ East 11th Street, Austin, TX | May 7, 2026 |
| Goodnight Ranch Planned Unit Development Amendment No. 3 | approved | mixed use | 6,308 | — | 635,000 | 2027 | — | East side of Old Lockhart Road between Nuckols Crossing Road and Capitol View Drive, Austin, Travis County, Texas | May 7, 2026 |
| 6th & Lamar / Baylor Street Mixed-Use Project | approved | mixed use | 93 | 9 | — | 2026 | — | 600 North Lamar Boulevard; 1004-1016 W 6th Street; 603 and 605 Baylor Street, Austin, TX | May 7, 2026 |
| Kramer Substation (also called Kramer Lane Substation / Kramer Substation energized) | completed | infrastructure | — | — | — | 2027 | $25,000,000 | Burnet Road and Esperanza Crossing, North Austin, Texas | May 7, 2026 |
| Workbench | under construction | mixed use | — | 4 | 50,000 | 2026 | $10,000,000 | 2422 E. Seventh St., Austin, TX 78702 | May 7, 2026 |
| Juniper Creek Apartments | completed | mixed use | 110 | 5 | — | 2026 | — | 11630 North Lamar Boulevard, Austin, TX 78753 | May 7, 2026 |
| 28-Story Apartment Tower at 2500 Braker Lane | approved | mixed use | 307 | 28 | 289,393 | 2027 | $60,345,000 | 2500 Braker Lane, Austin, TX 78758 | May 7, 2026 |
| 1000 Red River | approved | mixed use | 352 | 74 | 1,500,000 | 2026 | $520,000,000 | 1001 Trinity Street; 416½ & 502½ East 10th Street; 1000-1020 Red River Street; 503-516½ East 11th Street, Austin, TX | May 7, 2026 |
| St. John Site Redevelopment | approved | mixed use | 526 | — | — | — | — | 7211 & 7309 N Interstate 35 (800 E St Johns Ave), Austin, TX 78752 | May 7, 2026 |
| Waterline Tower | under construction | mixed use | 352 | 74 | 2,700,000 | 2026 | $520,000,000 | 98 Red River Street, Austin, TX | May 7, 2026 |
| $31M Motion Apartments Near Schumacher Lane | proposed | mixed use | — | — | — | — | $31,000,000 | Schumacher Lane, Leander, TX | May 6, 2026 |
| Norman Commons | completed | mixed use | 156 | 4 | — | 2025 | $62,300,000 | 5712 Jackie Robinson St, Austin, TX 78721 | May 6, 2026 |
| The Sasha | under construction | mixed use | 60 | 5 | — | 2027 | $28,821,372 | 1401 Grove Boulevard, Austin, TX 78741 | May 6, 2026 |
| St. John Site Redevelopment | approved | mixed use | 526 | — | — | — | — | 800 E St. Johns Avenue, Austin, TX 78752 | May 6, 2026 |
| $26.8M Build & Preserve Affordable Housing Fund – 8 Developments | approved | mixed use | 590 | — | — | 2027 | — | 1325 Grove Boulevard, Austin, TX 78741 | May 6, 2026 |
| Blocks 16 & 18 Mixed-Use Redevelopment | approved | mixed use | 130 | — | 185,000 | 2029 | $112,000,000 | East 11th Street between Juniper & Waller Streets, Austin, TX | May 6, 2026 |
| 7700 Parmer Campus Mixed-Use Redevelopment | approved | mixed use | 1,800 | — | 3,000,000 | 2026 | — | 7700 West Parmer Lane, Austin, Texas 78729 | May 6, 2026 |
| Barbara Jordan Terminal Expansion & Yellow Garage | under construction | mixed use | — | 7 | 75,000 | 2027 | $250,000,000 | Austin-Bergstrom International Airport, 3600 Presidential Blvd, Austin, TX 78719 | May 6, 2026 |
| Quarry Oaks ‒ Building III | proposed | mixed use | 300 | — | — | — | — | 10901 Stonelake Blvd, Austin, TX 78759 | May 5, 2026 |
| MLK & 18th Towers | approved | mixed use | 379 | — | — | — | — | Block bounded by West Martin Luther King Jr. Boulevard, West 18th Street, Rio Grande Street and Nueces Street, Austin, TX | May 5, 2026 |
| North Burnet/Gateway RSMU Rezoning | approved | rezoning | — | — | — | 2027 | $49,300,000 | Area bounded by Braker Lane; Burnet Road; MoPac Expressway; Stonelake Boulevard, Austin, TX | May 5, 2026 |
| Indigo Ridge South Planned Development | approved | mixed use | 650 | — | 462,000 | 2028 | $65,000,000 | 440 S. Parkwest Drive, Cedar Park, TX 78613 | May 5, 2026 |
| Walnut Creek Wastewater Treatment Plant Expansion and Modernization | under construction | infrastructure | — | — | — | 2032 | $1,500,000,000 | FM 969, Austin, TX 78724 | May 5, 2026 |
| St. John Site Redevelopment | approved | mixed use | 526 | — | — | — | — | 800 E St. Johns Avenue, Austin, TX 78752 | May 5, 2026 |
| MLK & 18th Towers | approved | mixed use | 379 | — | — | — | — | Block bounded by West Martin Luther King Jr. Boulevard, West 18th Street, Rio Grande Street and Nueces Street, Austin, TX | May 4, 2026 |
| St. John Site Redevelopment | approved | mixed use | 526 | — | — | — | — | 800 E. St. Johns Avenue, Austin, TX 78752 | May 4, 2026 |
| Augustine | under construction | mixed use | 343 | 5 | — | 2026 | — | 707 W Slaughter Lane, Austin, TX 78748 | May 4, 2026 |
| The District | under construction | mixed use | 316 | 7 | — | 2028 | — | Intersection of SH 45 and Greenlawn Boulevard (near Dell campus), Round Rock, TX | May 4, 2026 |
| Citywide Density Bonus Program (Case C20-2024-004) | proposed | mixed use | — | — | — | 2027 | — | Citywide, Austin | May 4, 2026 |
| The Martin | under construction | mixed use | 375 | 7 | 500,000 | 2027 | $70,000,000 | 2730 E. 7th St, Austin, TX 78702 | May 4, 2026 |
| GFTX Riverfront Eco-Park (aka Tesla Riverpark / Ecological Paradise beside Giga Texas) | approved | mixed use | — | — | — | — | — | East of I-35 along Colorado Riverfront, Austin | May 4, 2026 |
| North Burnet/Gateway RSMU Rezoning | approved | rezoning | — | — | — | — | — | Area bounded by Braker Lane; Burnet Road; MoPac Expressway; Stonelake Boulevard, Austin, TX | May 4, 2026 |
| 1000 Red River Block Redevelopment | approved | mixed use | 352 | 74 | 1,500,000 | 2026 | $520,000,000 | 1000 Red River Street; 1001 Trinity Street; 416½ & 502½ East 10th Street; 1000-1020 Red River Street; 503-516½ East 11th Street, Austin, TX 78701 | May 4, 2026 |
| Highpoint 2222 (formerly 3M Campus) | proposed | mixed use | — | — | 1,100,000 | 2027 | $610,000,000 | 6801 River Place Boulevard, Austin, TX 78726 | May 3, 2026 |
| MLK Towers: Hotel, Condos & Apartments | approved | mixed use | 379 | — | — | — | — | West MLK Jr Blvd, full block between Rio Grande & Nueces Streets, Austin, TX | May 3, 2026 |
| 9Hundred (proposed high-rise student housing) | proposed | mixed use | 427 | 30 | — | 2029 | — | 900 W. 23rd St, Austin, TX | May 3, 2026 |
| Anita Coy Apartments (Anita Ferrales Coy Facility Redevelopment) | under construction | mixed use | 675 | — | — | 2028 | $142,000,000 | 4900 Gonzales Street, Austin, TX 78702 | May 3, 2026 |
| MLK & 18th Towers | approved | mixed use | 379 | — | — | — | — | Block bounded by West Martin Luther King Jr. Boulevard, West 18th Street, Rio Grande Street, and Nueces Street, Austin, TX | Apr 30, 2026 |
| Anita Ferrales Coy Facility Redevelopment | under construction | mixed use | 675 | 5 | 1,135,000 | 2028 | $142,000,000 | 4812 Gonzales Street / 4900 Gonzales Street, Austin, Texas | Apr 30, 2026 |
| Springdale Farm Follow-Up (755 Springdale Rd) | proposed | mixed use | 130 | — | — | — | — | 755 Springdale Rd, Austin, TX 78702 | Apr 30, 2026 |
| North Burnet/Gateway RSMU Rezoning | approved | rezoning | — | — | — | — | — | Area bounded by Braker Lane; Burnet Road; MoPac Expressway; Stonelake Boulevard, Austin, TX | Apr 30, 2026 |
| BillionToOne Lab at EastVillage | under construction | mixed use | — | — | 223,500 | 2027 | — | 3600 Breakthrough Loop, Austin, TX 78754 | Apr 29, 2026 |
| 1404 East Riverside PUD (1400½ & 1404 East Riverside Drive) | proposed | mixed use | 381 | — | — | — | — | 1400½, 1404, 1404½, and 1408 East Riverside Drive, Austin, TX 78741 | Apr 29, 2026 |
| 1000 Red River (Rezoning 1000 Red River & adjoining parcels to DMU) | approved | mixed use | 352 | 74 | 1,500,000 | 2026 | $520,000,000 | 1000 Red River Street; bounded by East 10th Street, Trinity Street, East 11th Street, Austin, TX | Apr 29, 2026 |
| Missing-Middle & Mixed-Use Zoning Expansion Study / Policy Change | approved | mixed use | — | — | — | 2027 | — | Various neighborhoods, Austin, TX | Apr 28, 2026 |
| UT Dell Campus for Advanced Research & UT Dell Medical Center | proposed | mixed use | — | — | — | 2030 | $2,500,000,000 | 27 acres southwest of West Braker Lane & MoPac Boulevard, former West Pickle Research Campus, North Austin, Texas | Apr 28, 2026 |
| Rezoning Approved Near Q2 Stadium for Mixed-Use Towers (10200-10202 McKalla Place) | approved | mixed use | — | — | — | — | — | 10200 & 10202 McKalla Place, Austin, TX 78758 | Apr 28, 2026 |
| I-35 Capital Express Central | under construction | mixed use | — | — | — | 2033 | $4,500,000,000 | I-35 Corridor, Central Austin, Texas, from US 290 East to SH 71/Ben White Boulevard | Apr 27, 2026 |
| Donley Mixed Use (Q2 Stadium Assemblage Phase 1) | approved | mixed use | 450 | 6 | 271,098 | 2028 | $70,000,000 | 2101-2201 Donley Drive; 2111-2115 Kramer Lane, Austin, TX 78758 | Apr 27, 2026 |
| Former Rosedale School Site Apartments | approved | mixed use | 435 | 6 | — | — | — | 2117 W. 49th St., Austin, TX 78756 | Apr 27, 2026 |
| UnconventionalATX: Austin Convention Center Redevelopment | under construction | mixed use | — | 30 | 620,000 | 2028 | $1,600,000,000 | 201 E. 2nd St., Austin, TX 78701 | Apr 27, 2026 |
| Downtown Street Overhaul Plan | approved | mixed use | — | — | — | 2042 | $835,000,000 | Downtown Austin, TX | Apr 26, 2026 |
| 1000 Red River Mixed-Use Block / former Teacher Retirement System HQ redevelopment | approved | mixed use | — | — | — | — | — | 1000 Red River Street; bounded by E 10th, E 11th & Trinity Streets, Austin, TX 78701 | Apr 26, 2026 |
| Colony Park Sustainable Community | under construction | mixed use | 3,000 | — | — | — | $257,000,000 | Loyola Lane between Johnny Morris Road and Decker Lane, Northeast Austin, TX | Apr 26, 2026 |
| TownLake YMCA PUD Redevelopment | proposed | mixed use | 750 | — | 110,000 | 2028 | — | 1100 West Cesar Chavez Street, Austin, TX 78703 | Apr 26, 2026 |
| Rezoned Mixed-Use Project Near Q2 Stadium (6.76-acre site) | approved | mixed use | — | — | 135,000 | — | — | Approx. 10200 & 10202 McKalla Place, Austin, TX | Apr 23, 2026 |
| The Grove at Shoal Creek | approved | mixed use | 1,515 | — | — | — | — | Bull Creek Road and 45th Street, Austin, TX | Apr 23, 2026 |
| Goodnight Ranch PUD Amendment #3 | approved | mixed use | 6,308 | — | 635,000 | 2027 | $50,000,000 | East side of Old Lockhart Road between Nuckols Crossing Road and Capitol View Drive, Austin, Travis County, Texas | Apr 22, 2026 |
| GFTX Riverfront Eco-Park / Tesla Ecological Paradise | proposed | mixed use | — | — | — | — | — | Austin Riverfront, Austin, TX | Apr 22, 2026 |
| Origin at The District | under construction | mixed use | 316 | 7 | 603,585 | 2028 | $86,700,000 | 271 Marshall Circle, Round Rock, TX 78664 | Apr 22, 2026 |
| Block 185 (Sail Tower) | completed | mixed use | — | 35 | 1,530,000 | 2022 | — | 601 West Second Street, Austin, TX 78701 | Apr 20, 2026 |
| Anita Ferrales Coy Facility Redevelopment / Anita Coy Apartments East & West | under construction | mixed use | 675 | — | — | 2027 | — | 4900 Gonzales Street, Austin, Travis County, Texas 78702 | Apr 20, 2026 |
| Willows Crossing / Persimmon Point / The Sasha (Housing Accelerator Loan Fund Packages) | under construction | mixed use | — | — | — | — | — | Central Texas | Apr 20, 2026 |
| 1000 Red River | approved | mixed use | 352 | 74 | 1,500,000 | 2026 | $520,000,000 | 1000 Red River Street; 1001 Trinity Street; 416½ & 502½ East 10th Street; 503-516½ East 11th Street, Austin, TX | Apr 20, 2026 |
| Colony Park Sustainable Community | under construction | mixed use | 3,000 | — | — | — | $257,000,000 | City-owned land between Johnny Morris Road & Decker Lane along Loyola Lane, Northeast Austin, TX 78724 | Apr 19, 2026 |
| MLK & 18th Hotel & Multifamily Towers | approved | mixed use | 379 | — | — | — | — | Block bounded by West Martin Luther King Jr. Boulevard, West 18th Street, Rio Grande Street and Nueces Street, Austin, TX | Apr 19, 2026 |
| Journey With AUS – Airfield Capacity Improvements Project | approved | mixed use | — | — | — | — | $4,000,000,000 | Austin–Bergstrom International Airport, 3600 Presidential Blvd, Austin, TX 78719 | Apr 19, 2026 |
| 7700 Parmer Campus Mixed-Use Redevelopment | approved | mixed use | 1,800 | — | 3,000,000 | — | — | 7700 West Parmer Lane, Austin, Texas 78729 | Apr 16, 2026 |
| South First Affordable Apartments | approved | mixed use | 125 | — | — | — | — | 714 Turtle Creek Boulevard & 5609 Cougar Lane, Austin, TX 78745 | Apr 16, 2026 |
| Austin ‘Missing Middle’ & Mixed-Use Zoning Districts Initiative | proposed | mixed use | — | — | — | 2027 | — | 703 East Covington Drive, Austin, TX | Apr 16, 2026 |
| West 18th & Nueces Rezoning / MLK-Rio Grande-18th Redevelopment (C14-2025-0093) | proposed | mixed use | 662 | — | — | — | — | 1801 Rio Grande Street; 602-604 W 18th Street; 1800-1802 Nueces Street, Austin, TX | Apr 15, 2026 |
| 10200 McKalla Place Rezoning / Future Residential Project | approved | mixed use | — | — | 135,000 | — | — | 10200 and 10202 McKalla Place, Austin, TX | Apr 15, 2026 |
| Juniper Creek Apartments | completed | mixed use | 110 | — | 1,100,000 | 2027 | $38,300,000 | 11630 North Lamar Boulevard, Austin, TX 78753 | Apr 15, 2026 |
| Boulevard & Nueces Street Towers | proposed | mixed use | 679 | — | — | — | — | 601-619 W Martin Luther King Jr Blvd; 1809 Rio Grande St; 1806 Nueces St; 602-604 W 18th St; 1800 & 1802 Nueces St; 1801 Rio Grande Street, Austin, TX | Apr 14, 2026 |
| 1000 Red River | approved | mixed use | 352 | 74 | 1,500,000 | 2026 | $520,000,000 | 1000 Red River Street; 1001-1020 Red River Street; 416½ & 502½ East 10th Street; 503-516½ East 11th Street; 1018 & 1020 Red River Street; 1001 Trinity Street; East 10th-11th Streets, Austin, TX | Apr 13, 2026 |
| Residences at 10200 McKalla Place | approved | mixed use | — | — | — | — | — | 10200 and 10202 McKalla Place, Austin, TX 78758 | Apr 12, 2026 |
| Origin at The District | under construction | mixed use | 316 | 7 | 603,585 | 2028 | $86,700,000 | 271 Marshall Circle, Round Rock, TX 78664 | Apr 9, 2026 |
| Airport 38 Rezone | approved | mixed use | 160 | — | 49,336 | — | — | 3811 Airport Boulevard, Austin, TX | Apr 9, 2026 |
| GFTX Riverfront Eco-Park ("Ecological Paradise") | proposed | infrastructure | — | — | — | — | — | Riverfront adjacent to Tesla Gigafactory Texas, east of I-35, Travis County, near the Colorado River | Apr 9, 2026 |
| Unconventional ATX (Austin Convention Center Redevelopment & Expansion) | under construction | mixed use | — | 5 | 1,400,000 | 2028 | $1,600,000,000 | 500 E Cesar Chavez St, Austin, TX 78701 | Apr 9, 2026 |
| The District | under construction | mixed use | 316 | 7 | 603,585 | 2027 | $86,700,000 | I-35 / State Highway 45 Toll Road, Round Rock, TX (Marshall Circle, Round Rock, TX 78664) | Apr 6, 2026 |
| Rowen Vale | proposed | mixed use | 75 | 5 | — | — | — | 206 East Annie Street, Austin, TX 78704 | Apr 6, 2026 |
| Pathways at Santa Rita Courts East | approved | mixed use | 104 | 4 | 35,000 | 2028 | $30,000,000 | 2330, 2402, 2410 East 2nd Street; 2401, 2409 Santa Rita Street, Austin, TX 78702 | Apr 6, 2026 |
| Origin at The District | under construction | mixed use | 316 | 7 | 603,585 | 2028 | $86,700,000 | 271 Marshall Circle, Round Rock, TX 78664 | Apr 5, 2026 |
| The Modern Austin Residences | completed | mixed use | 319 | 56 | — | 2025 | — | 610 Davis Street, Austin, TX 78701 | Apr 5, 2026 |
| The District | under construction | mixed use | 316 | 7 | 4,000,000 | 2028 | $500,000,000 | Greenlawn Boulevard & State Highway 45, Round Rock, Texas, USA | Apr 5, 2026 |
| Anita Coy Apartments (Anita Ferrales Coy Facility Redevelopment) | under construction | mixed use | 675 | — | — | 2028 | $142,000,000 | 4900 Gonzales Street, Austin, TX 78702 | Apr 2, 2026 |
| Austin AHFC $46.1M for 728 Affordable Rental Units (Multiple Projects) | approved | mixed use | 728 | — | — | — | $46,100,000 | — | Apr 2, 2026 |
| Six New Affordable Housing Projects | proposed | mixed use | — | — | — | — | — | Near Transit Locations | Apr 2, 2026 |
| Austin Hills Commerce Center Phase Two – Building 6 Warehouse | under construction | mixed use | — | — | 681,259 | 2027 | — | 11801 Decker Lake Road, Austin, TX 78724 | Apr 1, 2026 |
| Colony Park Sustainable Community | under construction | mixed use | 3,000 | — | — | — | $300,000,000 | 7900 Loyola Lane, Austin, TX 78724 | Apr 1, 2026 |
| 108 W Gibson - Change in Conditions | proposed | mixed use | — | — | — | — | — | 108 West Gibson Street and 107 West James Street, Austin, TX | Mar 31, 2026 |
| Montopolis-Fairway Mixed Use | approved | mixed use | 180 | — | — | — | — | 6202-6215 Caddie St., 1600-1614 Montopolis Dr., Fairway St., Austin, TX | Mar 31, 2026 |
| South Town Rezoning / South Town (US 290 Corridor Vertical Mixed-Use) | approved | mixed use | — | — | — | — | — | 4980, 5016, 5020 ½, and 5030 West U.S. Highway 290 Westbound, Austin, TX | Mar 31, 2026 |
| Colony Park Sustainable Community | under construction | mixed use | 3,000 | — | 360,000 | 2039 | $300,000,000 | 7900 Loyola Lane, Austin, TX 78724 | Mar 31, 2026 |
| Unconventional ATX (Austin Convention Center Redevelopment & Expansion) | under construction | mixed use | — | 30 | 1,437,569 | 2028 | $1,600,000,000 | 500 E Cesar Chavez St, Austin, TX 78701 | Mar 30, 2026 |
| 10200 & 10202 McKalla Place Rezoning / Future Towers Near Q2 Stadium | approved | mixed use | — | — | 135,000 | — | — | 10200 & 10202 McKalla Place, Austin, TX | Mar 30, 2026 |
| 350-Foot By-Right Height Cap / CBD Interim Height Limit | approved | mixed use | — | — | — | 2026 | — | Central Business District, Downtown Austin, Texas, USA | Mar 30, 2026 |
| 10200-10202 McKalla Place High-Rise Mixed-Use | approved | mixed use | — | — | — | — | — | 10200-10202 McKalla Place, Austin, TX 78758 | Mar 29, 2026 |
| Prospect Heights & Persimmon Point Affordable Homeownership Units | under construction | mixed use | 138 | — | 185,000 | 2026 | $39,193,821 | Prospect Heights (District 1, near Rosewood Courts, East Austin) & Persimmon Point, 7051 Meadow Lake Blvd, Austin, TX 78744 | Mar 29, 2026 |