Pilot Knob Supply Water Transmission Main Project
Pilot Knob area, Austin, Texas
under review
Basic Information
- Project Type
- infrastructure
- Building Use
- public space
Size & Capacity
Square Footage
Timeline
- First Discovered
- 2/6/2026
Financial
- Total Construction Cost
- $20,000,000
Internal Notes
The project aims to install a 72-inch water transmission main from an existing 66-inch main near Longhorn Dam to the Pilot Knob Reservoir, enhancing water supply capacity for Southeast Austin and addressing projected growth in the area. It is part of long-range plans for system resiliency and is a recommendation from the 2021 Winter Storm Uri After Action Report.