Nashville Airport's New CONRAC & Garage D Underway
Nashville Airport's New Horizon CONRAC & Garage D, a 3.5M sq ft project, completes in 2029.

New Horizon CONRAC & Parking Garage D is under construction at Nashville International Airport. Designed by Demattei Wong Architecture, it spans 3.5 million sq ft over six floors.

The project includes a 3,000-space parking garage. The rental car facility holds 4,700 vehicles and adds a customer service building, quick-turnaround areas with fueling and car wash, and bridges and roadways connecting to Terminal Drive.

Developed by the Metropolitan Nashville Airport Authority (MNAA), completion is slated for 2029.

Correction, Oct. 22, 2026: An earlier version of this story gave the project's size as 1.1 million sq ft and listed features such as airline lounges, concessions and a live music stage. BNA puts the rental car facility and garage at 3.5 million sq ft, and those features belong to the airport's concourses.
- Address
- One Terminal Drive, Nashville International Airport, Nashville, TN 37214
- Floors
- 6
- Sq ft
- 3,500,000
- Completion
- 2029
Every filing, company, change and story we have on this project, under construction as of our latest read of the record.
Every new Nashville project, in your inbox at 8.
Read from the permits and filings each morning and written up as news. Free.
Free · unsubscribe anytime · no spam, just projects
Groundbreak covers 9 markets
Popular this week in Nashville
More from Nashville
All coverage ↗
AT&T 2nd Avenue Rebuild Completed at 185 2nd Ave N

The Landings at River North Completed on Nashville's East Bank

Mainstead MetroCenter Under Construction at 407 Great Circle Rd

Ferra: 325-Unit Mixed-Use Project Proposed for Second Ave. N.

280-Unit Vintage Fair Park Permitted at 492 Craighead St



