Groundbreak.

451-Unit NC 150 Apartment, Townhome Project Cancelled in Mooresville

Davis Development and Marquis Homes withdrew plans for 451 apartments and townhomes along N.C. 150 in Mooresville after planning board opposition.

Site of NC 150 Apartments & Parc at Lake Norman Townhomes at 833 River Highway (N.C. 150) and 214 Kendra Drive, Mooresville, NC
Site of NC 150 Apartments & Parc at Lake Norman Townhomes at 833 River Highway (N.C. 150) and 214 Kendra Drive, Mooresville, NCSatellite imagery © Mapbox, © Maxar · site map by Groundbreak

Two interdependent residential projects totaling 451 units along N.C. 150 in Mooresville have been cancelled. Developers of the Davis Development apartments and the Parc at Lake Norman townhomes, planned for 833 River Highway and 214 Kendra Drive, permanently withdrew their rezoning applications in November 2026. Commissioners voted unanimously to accept the withdrawals.

Davis Development proposed 261 apartments in three-story buildings, plus a 4,400-square-foot convenience store and gas station, a 5,500-square-foot strip retail center and a 5,500-square-foot sit-down restaurant. Marquis Homes proposed 190 townhomes in the Parc at Lake Norman community.

Site of NC 150 Apartments & Parc at Lake Norman Townhomes at 833 River Highway (N.C. 150) and 214 Kendra Drive, Mooresville, NC
Site of NC 150 Apartments & Parc at Lake Norman Townhomes at 833 River Highway (N.C. 150) and 214 Kendra Drive, Mooresville, NCSatellite imagery © Mapbox, © Maxar · site map by Groundbreak

The Mooresville Planning Board unanimously recommended denial of both rezonings in June 2026, citing traffic and density concerns. The projects were linked: Parc at Lake Norman needed road access through the Davis site, while the Davis apartments needed utility connections through the townhome site.

Davis Development previously built The Parian Mooresville luxury apartments across N.C. 150 from the proposed site. A widening project for N.C. 150 in the area is scheduled for completion in 2030.

Address
833 River Highway (N.C. 150) and 214 Kendra Drive, Mooresville, NC
Units
451
Floors
3

Every filing, company, change and story we have on this project, cancelled as of our latest read of the record.

The Charlotte Brief · free

Every new Charlotte project, in your inbox at 8.

Read from the permits and filings each morning and written up as news. Free.

Free · unsubscribe anytime · no spam, just projects

Groundbreak covers 9 markets

  1. 1

    Flint Mill No. 2 Adaptive Reuse Proposed in Gastonia

  2. 2

    Space Craft Lands $70.6M Loan for 371-Unit Mira in Optimist Park

  3. 3

    Tranquil Court Office Building Sold for $32.7M in Myers Park

  4. 4

    301 South Tryon Wins Historic Landmark Status in Uptown

  5. 5

    Cadia Village Matthews Breaks Ground at 14300 Idlewild Rd

More from Charlotte

All coverage ↗