Groundbreak.

Project Connect Light Rail Corridor On-Site Affordable Housing Requirement

ApprovedAffordable Housing
πŸ“ Project Connect light rail corridor (9.8-mile route), Austin, TXPolicyTracked since Sep 21, 2026
Rendering of a CapMetro light rail train at street level on the Project Connect corridor
Rendering of a CapMetro light rail train at street level on the Project Connect corridorGraphic: Austin Rail Now, adapted from original Downtown Austin Alliance map
Units
β€”
Floors
β€”
Height
β€”
Sq Ft
β€”
Groundbreak Pro

The full project file β€” complete specifications, permit records, field-by-field change history, and the project team β€” is part of Groundbreak Pro, along with the live pipeline map, saved-search alerts, and CSV export.

Go Pro β€” $19/month