Atlanta, GA Β· pro data
Every tracked development project, sorted by most recently updated.
| Project | Status | Type | Units | Floors | Height ft | Sq Ft | Updated |
|---|---|---|---|---|---|---|---|
| Ten Twenty Spring (1020 Spring) 1020 Spring St NW, Atlanta, GA 30309 | Completed | Other | β | 25 | 389 | 540,000 | Aug 29, 2026 |
| Generation Atlanta 369 Centennial Olympic Park Drive NW, Atlanta, GA 30313 | Completed | Other | 336 | 17 | β | 365,714 | Aug 29, 2026 |
| Ronald McDonald House Atlanta at Arthur M. Blank Hospital 2580 Briarcliff Rd NE, Atlanta, GA 30329 | Completed | Other | 110 | 5 | β | 126,000 | Aug 29, 2026 |
| Morehouse School of Medicine / Atrium Health Teaching Hospital at The MET Atlanta 675 Metropolitan Parkway SW, Atlanta, GA 30310 | Approved | Mixed Use | β | 7 | β | β | Aug 29, 2026 |
| Hanover Sugarloaf 1855 Satellite Boulevard, Duluth, GA 30097 | Under Construction | Other | 305 | 5 | β | β | Aug 29, 2026 |
| Christ Covenant Church Piedmont Place Conversion 3520 Piedmont Road NE, Atlanta, GA | Proposed | Other | β | β | β | β | Aug 29, 2026 |
| The Works Phase II (Upper Westside Mixed-Use Rezonings) Logan Circle and 1325-1417 Chattahoochee Avenue NW, Atlanta, GA | Approved | Mixed Use | β | β | β | 2,200,000 | Aug 29, 2026 |
| Eagles Nest Church Campus (The Beacon at East Roswell) - Former Kohl's Redevelopment 2342 Holcomb Bridge Road, Roswell, GA 30076 | Proposed | Mixed Use | β | β | β | 80,000 | Aug 29, 2026 |
| Ashwood Grove Townhomes (122 Townhomes at Ashwood Parkway) 1200 & 1240 Ashwood Parkway and 4754 Ashford Dunwoody Road, Dunwoody, GA 30338 | Approved | Other | 122 | 3 | β | β | Aug 29, 2026 |
| North River Shopping Center Redevelopment 8830 Roswell Road, Sandy Springs, GA 30350 | Approved | Mixed Use | 421 | 5 | β | β | Aug 29, 2026 |
| The Stitch Highway Capping Project Downtown Connector (I-75/I-85) via PeachtreeβCourtland Streets, Atlanta, GA | Approved | Infrastructure | β | β | β | β | Aug 29, 2026 |
| Atlanta Data Center Task Force Resolution (26-R-3853) Atlanta, GA | Proposed | Policy | β | β | β | β | Aug 29, 2026 |
| Meadow Glen Village 800 Meadow Glen Pkwy, Fairburn, GA 30213 | Completed | Mixed Use | 332 | 4 | β | 385,634 | Aug 29, 2026 |
| North Point Mall NHL Arena & Entertainment District North Point Mall, Alpharetta, GA | Proposed | Other | β | β | β | β | Aug 29, 2026 |
| Mechanicsville Mixed-Use Site South of Centennial Yards Mechanicsville, Atlanta, GA | Proposed | Other | β | β | β | β | Aug 29, 2026 |
| Northside Drive 10-Lot Assemblage Near Science Square Northside Drive, Atlanta, GA | Proposed | Other | β | β | β | β | Aug 29, 2026 |
| Five Points Station Transformation (Package 5) - MARTA Five Points Station 30 Alabama St SW, Atlanta, GA 30303 | Under Construction | Infrastructure | β | β | 27.7 | 144,400 | Aug 28, 2026 |
| Digital Realty West End Data Center (Adair Park Carrier Hotel) 713 Ralph David Abernathy Blvd, Atlanta, GA 30310 | On Hold | Infrastructure | β | 2 | β | 282,000 | Aug 28, 2026 |
| Mixed-Use Redevelopment at 515 Whitehall St. SW 515 Whitehall St. SW, Atlanta, GA 30303 | Proposed | Mixed Use | 30 | 4 | β | 32,000 | Aug 28, 2026 |
| Lucinda Bunnen Nature Preserve 3910 Randall Mill Road NW, Atlanta, GA 30327 | Proposed | Transaction | β | 1 | β | 7,000 | Aug 28, 2026 |
| The Bowie Apartments Sale 8800 Dunwoody Place, Sandy Springs, GA | Proposed | Other | β | β | β | β | Aug 28, 2026 |
| 166-Unit All-Affordable Apartments at 1119 Memorial Drive SE 1119 Memorial Drive SE, Atlanta, GA 30316 | Proposed | Other | 166 | 5 | β | β | Aug 28, 2026 |
| The Standard at Kennesaw 112 Townpark Drive, Kennesaw, GA 30144 | Under Construction | Other | 157 | 5 | 55 | β | Aug 28, 2026 |
| Growing Together for 2050: Metro ATL Development Strategy (Regional Development Plan) Metro Atlanta region | Approved | Policy | β | β | β | β | Aug 28, 2026 |
| Self-Storage Ban Orlando Amendment / Beltline Overlay Zoning Change 1 CNN Center, Atlanta, Georgia 30303 | Approved | Mixed Use | 304 | 19 | β | 1,200,000 | Aug 28, 2026 |
| Civic Center Redevelopment Phase I β Senior Affordable Housing (R1 Senior) Pine Street NE, Atlanta, GA 30308 | Under Construction | Mixed Use | 148 | 6 | β | β | Aug 28, 2026 |
| The Center (formerly CNN Center) 190 Marietta Street Northwest, Atlanta, GA 30303 | Completed | Mixed Use | β | 30 | β | 1,200,000 | Aug 28, 2026 |
| Woodworth Main Between GA Highway 92 & Old Highway 92, Cherokee County, GA | Approved | Mixed Use | 394 | β | β | β | Aug 28, 2026 |
| Hotel Phoenix & The Mitchell Towers at Centennial Yards (95 Centennial Olympic Park Drive & 250 MLK Jr. Drive) 95 Centennial Olympic Park Drive & 250 Martin Luther King Jr. Drive, Downtown Atlanta, GA | Completed | Mixed Use | 304 | 19 | β | β | Aug 28, 2026 |
| Hartsfield-Jackson Atlanta International Airport Capital Upgrades (Series 2026 Bonds / ATLNext) 6000 N. Terminal Pkwy, Atlanta, GA 30320 | Under Construction | Infrastructure | β | β | β | 231,000 | Aug 28, 2026 |
| The Lawrence Hotel Downtown Lawrenceville, GA | Proposed | Other | β | β | β | β | Aug 28, 2026 |
| Atlanta Data Center Task Force & Cooling Ordinance | Proposed | Other | β | β | β | β | Aug 28, 2026 |
| North Point Sports & Entertainment District (North Point Mall Redevelopment) 1000 North Point Circle, Alpharetta, GA 30022 | Approved | Mixed Use | 1,385 | 20 | β | 2,655,000 | Aug 28, 2026 |
| Woodrow House BTR Townhomes Off Southwest Beltline Trail, Atlanta, GA | Proposed | Other | β | β | β | β | Aug 28, 2026 |
| T5 ATL IV Data Center Campus Gullatt Road, Fairburn / Palmetto, Fulton County, Georgia, USA | Proposed | Mixed Use | β | 2 | β | 1,320,000 | Aug 28, 2026 |
| Courtland/Piedmont Safe Streets Project Courtland Street & Piedmont Avenue, Atlanta, GA | Approved | Infrastructure | β | β | β | β | Aug 28, 2026 |
| MOCA GA New Facility at Goat Farm Arts Center West Midtown, Goat Farm Arts Center, Atlanta | Under Construction | New Development | 0 | 0 | 0 | 26,306 | Aug 28, 2026 |
| Centennial Yards Next Tower β 280 Apartments + Retail Shops Gun Club Park site, Westside Atlanta, Atlanta, GA | Proposed | Mixed Use | 280 | 12 | β | β | Aug 28, 2026 |
| Overlook Cumming City Center, Cumming, GA | Under Construction | Mixed Use | 301 | β | β | β | Aug 28, 2026 |
| Rowen Knowledge Community / UCB Biologics Manufacturing Campus Rowen, Gwinnett County | Approved | Mixed Use | β | β | β | 460,000 | Aug 28, 2026 |
| Atlanta-Woodrow Apartments (JF41) South Atlanta submarket, Atlanta, Georgia | Under Construction | New Development | 300 | β | β | β | Aug 28, 2026 |
| Opportunity for All: The Neighborhood Reinvestment Initiative Multiple underserved areas, Atlanta, GA | Proposed | Infrastructure | β | β | β | β | Aug 28, 2026 |
| Automated Transit Network Demonstration Pilot (Glydways Pod Pilot) ATL Airport Area, Atlanta, GA | Under Construction | Mixed Use | β | β | β | β | Aug 28, 2026 |
| Atlanta BeltLine Affordable Housing Progress & Pipeline Developments Atlanta Beltline, Atlanta, GA | Proposed | Infrastructure | 5,600 | β | β | β | Aug 28, 2026 |
| Virgin Hotels Atlanta at Centennial Yards Ellis Street & adjacent to Centennial Olympic Park Drive, Downtown Atlanta, GA | Under Construction | Mixed Use | β | 14 | β | β | Aug 28, 2026 |
| South Downtown food-retail hub & Founders Green park South Broad & Mitchell Streets, South Downtown Atlanta, GA | Under Construction | Mixed Use | β | β | β | β | Aug 28, 2026 |
| Beltline-to-MARTA Trail Connector (Oakland City) Oakland City, Atlanta, GA | Proposed | Other | β | β | β | β | Aug 28, 2026 |
| Front Porch (Sweet Auburn) Auburn Avenue (Sweet Auburn), Atlanta | Completed | Mixed Use | 33 | β | β | β | Aug 28, 2026 |
| North Druid Hills Redevelopment Anchored by Nalley BMW North Druid Hills Road, Brookhaven, Georgia | Approved | Mixed Use | β | β | β | β | Aug 28, 2026 |
| Portman Mixed-Use Proposal: 1,400 Residences in Duluth Pleasant Hill Road & Peachtree Industrial Boulevard, Duluth, Gwinnett County, GA | Proposed | Mixed Use | 1,400 | β | β | β | Aug 28, 2026 |
| The Works Phase II (2.2M-Sq Ft Mixed-Use Village) Chattahoochee Avenue & Logan Circle, Atlanta, GA (Upper Westside) | Proposed | Mixed Use | β | β | β | 2,200,000 | Aug 28, 2026 |
| Automated Transit Network Demonstration Pilot ATL SkyTrain (Georgia International Convention Center) to Gateway Center Arena, College Park, GA | Under Construction | Mixed Use | β | β | β | β | Aug 28, 2026 |
| Atlanta Integrated Command Center City Hall, Atlanta, GA | Completed | Mixed Use | β | β | β | β | Aug 28, 2026 |
| Southeast Trail Segments 4 & 5 (Atlanta Beltline) Boulevard Southeast to Glenwood Avenue, Atlanta, Georgia | Completed | Mixed Use | 5,600 | β | β | β | Aug 28, 2026 |
| Selig Ponce Mixed-Use on Ponce de Leon & Bonaventure Corner of Ponce de Leon Ave & Bonaventure Ave, Atlanta, GA | Proposed | Mixed Use | 375 | 14 | β | β | Aug 28, 2026 |
| Reconnecting Scott Boulevard Complete Streets Plan Scott Boulevard, City of Decatur (Atlanta region) | Approved | Infrastructure | β | β | β | β | Aug 28, 2026 |
| Biltmore MidtownβGeorgia Tech Connection Project Biltmore, Midtown Atlanta, GA | Approved | Infrastructure | β | β | β | β | Aug 28, 2026 |
| Avondale Estates $350 Million Mixed-Use Plan Downtown Avondale Estates, DeKalb County, Georgia | Proposed | Mixed Use | 789 | 0 | 0 | 0 | Aug 28, 2026 |
| Intrenchment Creek Park Phase 1 Renovation Constitution & Bouldercrest Roads, DeKalb County, GA | Under Construction | Mixed Use | β | β | β | β | Aug 28, 2026 |
| Forsyth County One-Acre Lot Rezoning Lift Forsyth County, GA | Approved | Rezoning | β | β | β | β | Aug 28, 2026 |
| The Works Phase II Mixed-Use Village Chattahoochee Avenue & Logan Circle, Upper Westside, Atlanta, GA | Proposed | Mixed Use | 16 | β | β | 2,200,000 | Aug 28, 2026 |
| Atlanta's Westside 201 Mixed-Income Homes Westside Atlanta, GA | Proposed | Other | 201 | β | β | β | Aug 28, 2026 |
| Abebe Ventures Mixed-Use Development in Capitol View Sylvan Road, near Avon Avenue & Dill Avenue, Capitol View, Atlanta, GA | Proposed | Mixed Use | 3,032 | β | β | 716,000 | Aug 28, 2026 |
| Westside Thrive: Safely Linking Underserved Atlanta Communities Through Multimodal Improvements Westside corridor between Westside Park and Georgia Tech, Joseph E. Lowery Boulevard, Atlanta, GA | Approved | Infrastructure | β | β | β | β | Aug 28, 2026 |
| ARC / Sandy Springs PATH 400 & Roswell Road North End Boulevard Projects Sandy Springs, GA | Approved | Infrastructure | β | β | β | β | Aug 28, 2026 |
| Falling Water Park Campbellton Road near Mount Gilead Lake, Southwest Atlanta, Georgia | Proposed | Infrastructure | β | β | β | β | Aug 28, 2026 |
| Carter Proposed Mixed-Use Development South of Mercedes-Benz Stadium Mercedes-Benz Stadium, Atlanta, Georgia | Proposed | Mixed Use | 0 | 0 | 0 | 0 | Aug 28, 2026 |
| Springlake Park Corner of Springlake Road and Paper Mill Road, Lawrenceville, GA | Approved | Mixed Use | 90 | β | β | β | Aug 28, 2026 |
| UCB Biopharma to Anchor Rowen β Gwinnettβs 2,000-Acre Innovation Mini-City Rowen project site, near Dacula, Gwinnett County, GA | Approved | Mixed Use | β | β | β | 460,000 | Aug 28, 2026 |
| 1313 Sylvan Road Redevelopment (aka Capitol View / Avon-Sylvan) 1215 & 1313 Sylvan Road SW; 984, 985, & 997 Cox Avenue SW, Atlanta, GA 30310 | Proposed | Mixed Use | 3,032 | β | β | β | Aug 28, 2026 |
| Northbend Corporate Square Boulevard (1, 2, 3, 7, 8, 9, 11, 12, 13, and 54 Corporate Boulevard), Brookhaven, Georgia | Approved | Mixed Use | 1,720 | β | β | β | Aug 28, 2026 |
| Sylvan Road Redevelopment 1313 Sylvan Road SW & 1215 Sylvan Road SW; parcels at 984, 985, and 997 Cox Avenue SW, Atlanta, GA | Approved | Mixed Use | 3,032 | β | 225 | 716,000 | Aug 28, 2026 |
| Civic Center R1 Senior / Phase I of Atlanta Civic Center Redevelopment 395 Piedmont Avenue Northeast, Atlanta, GA 30308 | Under Construction | Mixed Use | 148 | 6 | β | 89,540 | Aug 28, 2026 |
| Northbend (formerly Corporate Square Redevelopment) Corporate Square Boulevard (1, 2, 3, 7, 8, 9, 11, 12, 13, and 54 Corporate Boulevard), Brookhaven, GA | Approved | Mixed Use | 1,720 | β | β | β | Aug 28, 2026 |
| Medley Johns Creek 11650 Johns Creek Parkway, Johns Creek, Georgia 30097 | Under Construction | Mixed Use | 900 | β | β | 200,000 | Aug 28, 2026 |
| Sylvan Road Redevelopment (1313 & 1215 Sylvan Road Redevelopment) 1215 & 1313 Sylvan Road SW; also parcels 984, 985, 997 Cox Ave SW, Atlanta, GA | Approved | Mixed Use | 3,032 | β | 225 | 716,000 | Aug 28, 2026 |
| Medley at Johns Creek / Encore (Phase II of Medley mixed-use community) 11650 Johns Creek Parkway, Johns Creek, GA 30097 | Under Construction | Mixed Use | 408 | β | β | β | Aug 28, 2026 |
| Atlanta Civic Center Redevelopment / Phase 1 (Senior Affordable Housing) 395 Piedmont Avenue NE, Atlanta, GA 30308 | Under Construction | Mixed Use | 148 | 6 | β | β | Aug 28, 2026 |
| Civic Center Redevelopment β Phase I Affordable Senior Housing 395 Piedmont Avenue NE, Atlanta, GA 30312 | Under Construction | Mixed Use | 148 | 6 | 35 | β | Aug 28, 2026 |
| Empower Support Services-LLC 5405 MEMORIAL DR, DeKalb County, GA | Approved | Other | β | β | β | β | Aug 28, 2026 |
| Atlanta Beltline Southside Trail β Segments 2 & 3 West of I-75/85 to Boulevard, Atlanta, GA | Under Construction | Infrastructure | β | β | β | β | Aug 28, 2026 |
| Underground Atlanta & Upper Alabama Street / Peachtree Fountains Plaza Upgrades Upper Alabama Street & Peachtree Fountains Plaza, 50 Upper Alabama Street, Downtown Atlanta, GA 30303 | Approved | Mixed Use | β | β | β | β | Aug 28, 2026 |
| The Stitch (Downtown Connector Greenspace) Over Interstate 75/85 between Ted Turner Drive and Piedmont Avenue, Atlanta, Georgia | Proposed | Infrastructure | β | β | β | 14,000,000 | Aug 28, 2026 |
| Origin Hotel in South Downtown South Downtown Atlanta (exact street address not provided) | Completed | New Development | 0 | β | β | β | Aug 28, 2026 |
| Bowen Homes / Englewood North Redevelopment & CHaRM Relocation Former Bowen Homes site, near Bankhead, Atlanta, GA | Proposed | Mixed Use | β | β | β | β | Aug 28, 2026 |
| MARTA Five Points Station Overhaul Five Points Station, Downtown Atlanta, GA | Under Construction | Renovation | β | β | β | β | Aug 28, 2026 |
| Juniper Complete Street Project (Juniper Street Transformation Project) Juniper Street, from 14th Street to Ponce de Leon Avenue, Atlanta, Georgia | Completed | Mixed Use | β | β | β | β | Aug 28, 2026 |
| Hulsey Yard Mixed-Use / Green Space Report (Emerald Necklace update) Hulsey Yard, Atlanta, GA | Under Review | Rezoning | β | β | β | β | Aug 28, 2026 |
| Centennial Yards Next Tower adjacent to the Richard B. Russell Federal Building, Downtown Atlanta, GA | Proposed | Mixed Use | 280 | 12 | 0 | 8,000,000 | Aug 28, 2026 |
| Northbend (Corporate Square redevelopment) Corporate Square, Brookhaven, Georgia | Approved | Mixed Use | 530 | β | β | β | Aug 28, 2026 |
| The Stitch (Downtown Connector cap park) Over I-75/85 between Ted Turner Drive and Piedmont Avenue, Atlanta | Approved | Infrastructure | β | β | β | 1,400,000 | Aug 28, 2026 |
| The Stitch South Downtown, Atlanta, GA | Approved | Infrastructure | 140 | β | β | β | Aug 28, 2026 |
| Andrew Young International Institute for Peace and Reconciliation City-owned lot overlooking Rodney Cook Sr. Park, Vine City, Atlanta, GA | Proposed | Mixed Use | 20,000 | β | β | 80,000 | Aug 28, 2026 |
| Alexan 1280-Parking Deck 1280 CHATTAHOOCHEE NW, ATLANTA, GA 30318 | Approved | Other | β | β | β | β | Aug 28, 2026 |
| DSW Store 29084 / Siuite 205 1 BUCKHEAD LOOP NE, ATLANTA, GA 30326 | Approved | Other | β | β | β | β | Aug 28, 2026 |
| UrbA ATL 480 17th St NW, Atlanta, GA 30363 | Under Construction | Mixed Use | 321 | 5 | β | 378,000 | Aug 28, 2026 |
| 1349 West Peachtree Nw 1349 WEST PEACHTREE NW, ATLANTA, GA 30309 | Approved | Other | β | β | β | β | Aug 28, 2026 |
| 1630 Montcliff Court 1630 MONTCLIFF CT, DeKalb County, GA | Approved | Other | β | β | β | β | Aug 28, 2026 |
| New Single Family 3028 WEST PINE VALLEY NW, ATLANTA, GA 30305 | Approved | Other | β | β | β | β | Aug 28, 2026 |
| The CTR (Former CNN Center / The Center) 1 CNN Center Plaza NW, Downtown Atlanta, GA 30303 | Completed | Mixed Use | 200 | β | β | 1,200,000 | Aug 28, 2026 |