Projects
Development projects in Atlanta, sorted by most recently updated
| Project Name | Status | Type | Units | Floors | Square Feet | Completion Year | Construction Cost | Address | Last Updated |
|---|---|---|---|---|---|---|---|---|---|
| 3600 Peachtree | proposed | mixed use | 300 | — | — | — | — | 3626 Peachtree Road NE, Atlanta, GA | Mar 4, 2026 |
| Brownsville Pointe | approved | mixed use | 18 | 3 | — | 2026 | $8,000,000 | 105 McDonough Boulevard SE, Atlanta, GA 30315 | Mar 4, 2026 |
| Jamestown Arena-Anchored Mixed-Use Entertainment District at North Point Mall | proposed | mixed use | — | — | 1,400,000 | — | — | North Point Mall site, Alpharetta, Georgia, USA | Mar 4, 2026 |
| 78/88 Howard Street Affordable Senior Housing | approved | mixed use | 47 | 3 | — | — | — | 78/88 Howard Street NE, Atlanta, GA | Mar 4, 2026 |
| 250 14th Street NE | proposed | mixed use | 110 | 20 | 19,448 | 2028 | $155,000,000 | 250 14th Street NE, Atlanta, GA 30309 | Mar 4, 2026 |
| Alina (1072 West Peachtree Street) | under construction | mixed use | 357 | 60 | 984,000 | 2026 | — | 1072 West Peachtree Street NW, Atlanta, GA 30309 | Mar 4, 2026 |
| Avondale Estates $350 Million Mixed-Use Plan | proposed | mixed use | 789 | — | — | 2025 | $350,000,000 | Downtown Avondale Estates, DeKalb County, Georgia | Mar 3, 2026 |
| Georgia-Pacific Center Mixed-Use Conversion | approved | mixed use | 400 | 51 | 1,300,000 | 2027 | — | 133 Peachtree Street NE, Atlanta, GA 30303 | Mar 3, 2026 |
| Northbend (formerly Corporate Square Redevelopment) | approved | mixed use | 1,720 | — | — | — | $605,000,000 | Corporate Square Boulevard (1, 2, 3, 7, 8, 9, 11, 12, 13, and 54 Corporate Boulevard), Brookhaven, GA | Mar 3, 2026 |
| The Works Phase II | proposed | mixed use | — | — | 2,200,000 | 2031 | — | Chattahoochee Avenue & Logan Circle vicinity, Upper Westside, Atlanta, GA 30318 | Mar 3, 2026 |
| Forge Atlanta | proposed | mixed use | 600 | — | 8,400,000 | — | $3,800,000,000 | Ted Turner Drive & Whitehall Street, Atlanta, GA 30303 | Mar 3, 2026 |
| Sylvan Hills II | under construction | mixed use | 233 | 3 | 1,300,000 | 2026 | $52,700,000 | 1924 Sylvan Road SW & 2046 Perkerson Road SW, Atlanta, GA 30310 | Mar 2, 2026 |
| The Center (Former CNN Center Redevelopment) | under construction | mixed use | — | — | 1,200,000 | 2026 | — | 1 CNN Center Plaza NW, Atlanta, GA 30303 | Mar 2, 2026 |
| Brownsville Pointe | under construction | mixed use | 18 | 3 | — | 2026 | — | 105 McDonough Boulevard SE & Jonesboro Road SE, Atlanta, GA 30315 | Mar 2, 2026 |
| 1072 West Peachtree Street | under construction | mixed use | 357 | 60 | 984,000 | 2026 | — | 1072 West Peachtree Street NW, Atlanta, GA 30309 | Mar 2, 2026 |
| Forge Atlanta | proposed | mixed use | 2,330 | — | 8,400,000 | — | $3,700,000,000 | Ted Turner Drive SW and Whitehall Street SW, Atlanta, GA 30303 | Mar 2, 2026 |
| The Center (former CNN Center) | under construction | mixed use | — | — | 1,200,000 | 2026 | $400,000,000 | 1 CNN Center Plaza NW, Atlanta, GA 30303 | Mar 1, 2026 |
| 3600 Peachtree | proposed | mixed use | 300 | — | — | — | — | 3600 Peachtree Road NE & Wieuca Road, Buckhead, Atlanta, GA | Mar 1, 2026 |
| Sylvan Hills II | under construction | mixed use | 233 | 3 | — | 2026 | $52,700,000 | 1924 Sylvan Circle SW; also parts at 1930 Sylvan Road & 2046 Perkerson Road SW, Atlanta, GA | Mar 1, 2026 |
| 1313 Sylvan Road Redevelopment | proposed | mixed use | 3,000 | — | 716,000 | 2035 | $1,000,000,000 | Sylvan Road (Capitol View), Southwest Atlanta, GA | Feb 26, 2026 |
| 78/88 Howard Street NE Senior Multifamily with Supportive Services | proposed | mixed use | 47 | 3 | — | — | — | 78/88 Howard Street NE, Atlanta, GA 30317 | Feb 26, 2026 |
| Murphy Crossing | on hold | mixed use | 1,100 | — | — | — | — | 1050 Murphy Avenue SW, Atlanta, GA | Feb 25, 2026 |
| 356 University Avenue Mixed-Income / Mixed-Use Project | proposed | mixed use | — | — | — | — | — | 356 University Avenue, Atlanta, GA | Feb 25, 2026 |
| Forge Atlanta | proposed | mixed use | 2,330 | — | 8,400,000 | 2026 | $3,800,000,000 | Ted Turner Drive & Whitehall Street SW, Atlanta, GA 30303 | Feb 25, 2026 |
| ATL Zoning 2.0 Ordinance Update | proposed | infrastructure | — | — | — | 2026 | — | Citywide | Feb 24, 2026 |
| Forge Atlanta | proposed | mixed use | 2,300 | — | 8,400,000 | 2026 | $756,000,000 | Sites at Fair Street SW & Whitehall Street SW, Downtown Atlanta, GA | Feb 24, 2026 |
| Capitol View / Sylvan (Avon-Sylvan) Mixed-Use Development | proposed | mixed use | 3,032 | — | 716,000 | 2035 | $1,000,000,000 | Sylvan Road SW & Cox Avenue, Atlanta, GA | Feb 24, 2026 |
| The Center (formerly CNN Center) | under construction | mixed use | — | 30 | 1,200,000 | 2026 | — | 190 Marietta Street Northwest, Atlanta, GA 30303 | Feb 23, 2026 |
| Automated Transit Network (ATN) Demonstration Pilot | under construction | mixed use | — | — | — | 2026 | $20,000,000 | ATL SkyTrain (Georgia International Convention Center) to Gateway Center Arena, College Park, GA | Feb 23, 2026 |
| The Center (former CNN Center) – CTR Food Works Food Hall | under construction | mixed use | — | — | 1,200,000 | 2026 | — | 1 CNN Center Plaza NW, Atlanta, GA 30303 | Feb 23, 2026 |
| The Center (Former CNN Center Redevelopment) | under construction | mixed use | — | — | 1,200,000 | 2026 | — | 1 CNN Center / 190 Marietta St NW, Atlanta, GA 30303 | Feb 23, 2026 |
| Bowen Homes Redevelopment / Bowen Choice Neighborhood Transformation Plan | under construction | mixed use | 151 | — | 208,577 | 2026 | $63,600,000 | Bowen Homes site, NW Atlanta bounded by Donald Lee Hollowell Parkway and James Jackson Parkway, Atlanta, GA | Feb 23, 2026 |
| Brownsville Pointe | approved | mixed use | 18 | 3 | — | 2025 | — | McDonough Boulevard SE & Jonesboro Road SE, Atlanta, GA 30315 | Feb 23, 2026 |
| Forge Atlanta | proposed | mixed use | 600 | — | 8,400,000 | 2026 | $3,800,000,000 | Ted Turner Drive & Whitehall Street SW, Atlanta, GA 30303 | Feb 23, 2026 |
| Overlook | under construction | mixed use | 301 | — | — | 2027 | — | Cumming City Center, Cumming, GA | Feb 22, 2026 |
| SoFu Commerce Center | approved | mixed use | — | — | 213,580 | 2026 | $28,000,000 | South Fulton, GA | Feb 22, 2026 |
| 3600 Peachtree | proposed | mixed use | 300 | — | — | — | — | 3626 Peachtree Road NE, Atlanta, GA 30319 | Feb 22, 2026 |
| Sylvan Hills II | under construction | mixed use | 233 | 3 | — | 2026 | $52,700,000 | 1924 Sylvan Circle SW, Atlanta, GA | Feb 22, 2026 |
| The Stitch Highway Capping Project | approved | infrastructure | — | — | — | 2036 | $713,000,000 | Downtown Connector (I-75/I-85) via Peachtree–Courtland Streets, Atlanta, GA | Feb 19, 2026 |
| Atlanta Civic Center Redevelopment Phase I – Senior Affordable Housing | under construction | mixed use | 148 | 6 | — | 2027 | $60,000,000 | 140 Pine St NE, Atlanta, GA 30308 | Feb 19, 2026 |
| Murphy Crossing (Former State Farmers Market/BeltLine Overlay) | proposed | mixed use | 1,100 | — | — | — | — | 1050 Murphy Avenue SW, Atlanta, Fulton County, Georgia | Feb 19, 2026 |
| ATL Zoning 2.0 Ordinance | proposed | mixed use | 20,000 | — | — | 2030 | $200,000,000 | City-wide, Atlanta, GA | Feb 19, 2026 |
| Bowen Homes Redevelopment / Bowen Choice Neighborhood Transformation Plan | under construction | mixed use | 151 | — | 208,577 | 2026 | $63,600,000 | 2700 Yates Drive NW, Atlanta, GA | Feb 18, 2026 |
| Adaptive-Reuse Mixed-Use Development at 1500 Northside Drive (Former Myers Carpet Building) | under construction | mixed use | — | — | 32,000 | 2026 | — | 1500 Northside Drive NW, Atlanta, GA 30318 | Feb 18, 2026 |
| Brownsville Pointe | approved | mixed use | 18 | 3 | 2,790 | 2026 | $8,000,000 | 105 McDonough Boulevard SE & 1297 McDonough Boulevard SE, Atlanta, GA 30315 | Feb 18, 2026 |
| The Center (former CNN Center redevelopment) | under construction | mixed use | — | 15 | 1,146,402 | 2025 | — | 190 Marietta Street NW, Atlanta, GA 30303 | Feb 17, 2026 |
| The Lofts at Twenty25 | completed | mixed use | 623 | 16 | — | 2023 | — | 2025 Peachtree Road NE, Atlanta, GA 30309 | Feb 16, 2026 |
| Forge Atlanta | proposed | mixed use | 2,330 | — | 8,400,000 | — | $3,400,000,000 | Ted Turner Drive & Whitehall Street, Atlanta, GA 30303 | Feb 16, 2026 |
| Kirkwood Church Micro-Unit Housing for Formerly Unhoused Seniors | approved | mixed use | 47 | 3 | — | — | — | 88 Howard Street NE, Atlanta, GA | Feb 15, 2026 |
| Jamestown Properties New Office Tower | proposed | mixed use | — | — | — | — | — | Atlanta CBD | Feb 15, 2026 |
| Brownsville Pointe | approved | mixed use | 18 | 3 | — | 2026 | $8,000,000 | 105 McDonough Boulevard SE, Atlanta, GA 30315 | Feb 13, 2026 |
| Sylvan Hills II Family Apartments | under construction | mixed use | 233 | 3 | — | 2026 | $52,679,800 | 1924 Sylvan Circle SW, Atlanta, GA | Feb 13, 2026 |
| 646 Echo Street & 839 Joseph E. Boone Boulevard Affordable Housing | completed | mixed use | 57 | 3 | — | 2026 | $16,400,000 | 646 Echo Street NW & 839 Joseph E. Boone Boulevard NW, Atlanta, GA | Feb 13, 2026 |
| 425 Chappell Road | approved | mixed use | 1,100 | — | — | 2025 | $270,000,000 | 425 Chappell Road NW, Atlanta, GA 30318 | Feb 13, 2026 |
| Georgia-Pacific Center Mixed-Use Conversion | approved | mixed use | 400 | 52 | 1,300,000 | 2027 | — | 133 Peachtree Street NE, Atlanta, GA 30303 | Feb 13, 2026 |
| The Mitchell | completed | mixed use | 304 | 19 | 300,000 | 2026 | $5,000,000,000 | 250 Martin Luther King Jr. Dr. SW, Atlanta, Georgia | Feb 12, 2026 |
| Self-Storage Ban Orlando Amendment / Beltline Overlay Zoning Change | proposed | mixed use | 304 | 19 | 1,200,000 | 2025 | — | 1 CNN Center, Atlanta, Georgia 30303 | Feb 11, 2026 |
| Proposed Beltline Ban of Self-Storage near Beltline | proposed | mixed use | — | — | — | 2035 | $3,500,000,000 | Atlanta Beltline loop corridors | Feb 11, 2026 |
| Sylvan Hills II | under construction | mixed use | 233 | 3 | — | 2026 | $52,679,800 | 1924 Sylvan Circle SW, Atlanta, GA | Feb 11, 2026 |
| Chops Lobster Bar Downtown at Centennial Yards | approved | mixed use | 304 | 19 | 13,000 | 2023 | — | 85 Centennial Olympic Park Drive NW, Atlanta, GA 30303 | Feb 10, 2026 |
| Ordinance to Ban New Self-Storage, Warehousing, Distribution Uses Near the BeltLine | proposed | mixed use | — | — | — | — | — | Within ½-mile of the Atlanta Beltline | Feb 10, 2026 |
| Civic Center Redevelopment Phase I – Senior Affordable Housing (R1 Senior) | under construction | mixed use | 148 | 6 | — | 2027 | $60,000,000 | Pine Street NE, Atlanta, GA 30308 | Feb 10, 2026 |
| 579 Garson Drive Affordable Mixed-Use & 425 Chappell Road Affordable Community | approved | mixed use | 130 | — | — | 2026 | $60,000,000 | 579 Garson Drive, Atlanta, GA; 425 Chappell Road NW, Atlanta, GA | Feb 9, 2026 |
| Folio House (Phase II) at 143 Alabama Street | approved | mixed use | 197 | — | 95,000 | 2028 | — | 143 Alabama Street SW, Atlanta, GA 30303 | Feb 9, 2026 |
| Sylvan Hills II Family Apartments | under construction | mixed use | 233 | 3 | — | 2026 | $52,679,800 | 1924 Sylvan Circle SW, Atlanta, GA | Feb 9, 2026 |
| The Gathering at South Forsyth | approved | mixed use | 2,400 | — | 1,600,000 | 2033 | $3,000,000,000 | 1595 Union Hill Road, Alpharetta, GA 30005 | Feb 8, 2026 |
| Atlanta Beltline Expansion Plan – $3.5B Light Rail Loop | proposed | infrastructure | — | — | — | 2030 | $3,500,000,000 | Multiple corridors: Southside Trail, Northwest, Southeast, Southwest, Beltline, Atlanta, GA | Feb 8, 2026 |
| Piedmont Center Redevelopment Master Plan | proposed | mixed use | — | — | 2,200,000 | 2026 | — | 3525 Piedmont Road NE, Atlanta, GA 30305 | Feb 7, 2026 |
| Medley | under construction | mixed use | 900 | — | — | 2026 | $560,000,000 | 11650 Johns Creek Parkway, Johns Creek, GA 30097 | Feb 7, 2026 |
| Georgia-Pacific HQ Mixed-Use Redevelopment | approved | mixed use | 400 | 51 | 1,300,000 | 2027 | — | Georgia-Pacific Center, 133 Peachtree Street & John Wesley Dobbs Avenue NE, Downtown Atlanta, GA 30303 | Feb 7, 2026 |
| Sylvan Hills II | under construction | mixed use | 233 | — | — | 2026 | $52,700,000 | 1924 Sylvan Circle SW, Atlanta, GA | Feb 6, 2026 |
| Bike Park at Shirley C. Franklin Park | under construction | mixed use | — | — | — | 2026 | $18,000,000 | Shirley C. Franklin Park (formerly Westside Park), Johnson Road & Donald Lee Hollowell Parkway area, Atlanta, GA | Feb 6, 2026 |
| Woodworth Main | proposed | mixed use | 631 | — | — | 2030 | — | Between GA Highway 92 & Old Highway 92, Cherokee County, GA | Feb 6, 2026 |
| Forge Atlanta | approved | mixed use | 600 | — | 8,400,000 | — | $756,000,000 | between Ted Turner Drive and Whitehall Street, Atlanta | Feb 6, 2026 |
| Waterworks Village (Rapid Housing Project) | completed | mixed use | 100 | 3 | — | 2025 | $17,000,000 | 653 Green St NW, Atlanta, GA 30318 | Feb 6, 2026 |
| The Center (former CNN Center) | under construction | mixed use | — | — | 1,200,000 | 2026 | $400,000,000 | 190 Marietta Street NW, Atlanta, GA 30303 | Feb 6, 2026 |
| Church at Wieuca Mixed-Use / Wieuca Neighborhood Development | approved | mixed use | 300 | — | — | — | — | 3626 Peachtree Road NE, Atlanta, GA 30326 | Feb 6, 2026 |
| Hotel Phoenix & The Mitchell Towers at Centennial Yards (95 Centennial Olympic Park Drive & 250 MLK Jr. Drive) | under construction | mixed use | 304 | 18 | — | 2025 | — | 95 Centennial Olympic Park Drive & 250 Martin Luther King Jr. Drive, Downtown Atlanta, GA | Feb 6, 2026 |
| ARC Amendment to 2050 Metropolitan Transportation Plan / FY 2024-2027 TIP Projects | approved | infrastructure | — | — | — | 2027 | — | Atlanta Region (various projects) | Feb 6, 2026 |
| PowerUp Atlanta EV Chargers at Hartsfield-Jackson Airport | approved | infrastructure | — | — | — | — | — | Hartsfield-Jackson Atlanta International Airport, Atlanta | Feb 6, 2026 |
| Reconnecting Scott Boulevard Complete Streets Plan | approved | infrastructure | — | — | — | — | $1,872,000 | Scott Boulevard, City of Decatur (Atlanta region) | Feb 6, 2026 |
| Marlowe Chamblee | proposed | new development | 300 | 5 | — | 2027 | — | Chamblee, Georgia (30.5-acre Chamblee Park Mixed-Use Development) | Feb 6, 2026 |
| Mall West End Redevelopment | approved | mixed use | 893 | — | 1,700,000 | 2028 | — | West End, Atlanta, GA (12-acre site) | Feb 6, 2026 |
| 41 Marietta (Blue Lofts Conversion to Residential) | approved | renovation | 120 | — | — | 2025 | $32,000,000 | 41 Marietta Street, Downtown Atlanta, GA | Feb 6, 2026 |
| The Proctor (English Avenue) | under construction | new development | 137 | — | — | 2026 | $55,600,000 | English Avenue, Atlanta, GA | Feb 6, 2026 |
| Courtland/Piedmont Safe Streets Project | approved | infrastructure | — | — | — | — | $6,000,000 | Courtland Street & Piedmont Avenue, Atlanta, GA | Feb 6, 2026 |
| Abebe Ventures Major Mixed-Use Project in Southwest Atlanta (Capitol View) | proposed | mixed use | 3,032 | — | 716,000 | 2035 | — | Sylvan Road (between Avon Avenue and Dill Avenue), Capitol View, Southwest Atlanta | Feb 6, 2026 |
| Hulsey Yard Mixed-Use / Green Space Report (Emerald Necklace update) | under review | rezoning | — | — | — | — | — | Hulsey Yard, Atlanta, GA | Feb 6, 2026 |
| The Stitch (I-75/85 Caps / Greenspace / Connector Project) | approved | infrastructure | — | — | 1,400,000 | 2030 | $600,000,000 | Between Ted Turner Drive and Piedmont Avenue, spanning I-75/I-85 Downtown Connector, Atlanta, GA | Feb 6, 2026 |
| 840 Woodrow Apartments (Woodrow Street Mixed-Use) | approved | mixed use | 326 | — | — | 2027 | $76,760,000 | Woodrow Street SW, Southwest Atlanta, GA | Feb 6, 2026 |
| 840 Woodrow | approved | mixed use | 326 | — | — | 2027 | $76,760,000 | Woodrow Street SW, Atlanta, Georgia | Feb 6, 2026 |
| The Stitch | approved | infrastructure | — | — | 1,400,000 | 2030 | $800,000,000 | Over I-75/85 between Ted Turner Drive and Piedmont Avenue, Atlanta, GA | Feb 6, 2026 |
| MARTA Five Points Station Overhaul | under construction | renovation | — | — | — | 2026 | $230,000,000 | Five Points Station, Downtown Atlanta, GA | Feb 6, 2026 |
| SR 400 Express Lanes Project | approved | infrastructure | — | — | — | 2031 | $10,800,000,000 | SR 400 corridor from MARTA North Springs Station to one mile north of McFarland Parkway, Atlanta area | Feb 6, 2026 |
| ARC / Sandy Springs PATH 400 & Roswell Road North End Boulevard Projects | approved | infrastructure | — | — | — | 2029 | $40,000,000 | Sandy Springs, GA | Feb 6, 2026 |
| Abebe Ventures Mixed-Use Development in Capitol View | proposed | mixed use | 3,032 | — | 716,000 | 2035 | — | Sylvan Road, near Avon Avenue & Dill Avenue, Capitol View, Atlanta, GA | Feb 6, 2026 |
| Front Porch (Sweet Auburn) | completed | mixed use | 33 | — | — | 2025 | $37,500,000 | Auburn Avenue (Sweet Auburn), Atlanta | Feb 6, 2026 |
| The Stitch (Downtown Connector cap park) | approved | infrastructure | — | — | 1,400,000 | 2036 | $713,000,000 | Over I-75/85 between Ted Turner Drive and Piedmont Avenue, Atlanta | Feb 6, 2026 |
| Enota Park expansion | under construction | renovation | — | — | — | 2026 | $14,000,000 | Westview neighborhood, Atlanta along the Beltline Westside Trail | Feb 6, 2026 |
| Amsterdam Walk redevelopment | proposed | mixed use | 1,100 | 9 | 1,200,000 | 2029 | $53,000,000 | 501 Amsterdam Way, off Monroe Drive, Atlanta, Georgia | Feb 6, 2026 |