The East Bend (formerly East Bend, also referred to as Eastpoint / Wasioto Bend)
Approvedπ PSC Metals scrapyard site south of Nissan Stadium, Nashville, TennesseeMixed UseTracked since Jun 9, 2026

Units
7,000
Floors
β
Height
β
Sq Ft
β
Specifications
- Status
- Approved
- Use
- Mixed Use
- Units
- 7,000
- Zoning
- Downtown Code (DTC), East Bend Subdistrict regulating plan adopted via rezoning
- Lot Size
- 47 ac
parksgreenwaysriverfront accessbioretention flood mitigationopen plazaspublic spacescultural anchor (Music City Children's Museum option being considered)
Groundbreak Pro
The full project intelligence file β full permit records, field-by-field change history, and the project team β is part of Groundbreak Pro, along with the live pipeline map, saved-search alerts, and CSV export.
Go Pro β $19/monthRenderings & Photos
