Groundbreak.

Fouquet's Miami Files Demolition and Construction Permits at 3995 N Miami Ave

Demolition, site work, phased vertical and master construction permits have been filed with the City of Miami for Fouquet's Miami, a 143-condo, 85-key hotel project in the Design District.

Rendering of Fouquet's Hotel & Residences from North Miami Avenue at dusk
Rendering of Fouquet's Hotel & Residences from North Miami Avenue at duskRendering courtesy of Fort Partners

Permits have been filed with the City of Miami for Fouquet's Miami, the hotel and condo project at 3995 North Miami Avenue in the Miami Design District, Florida YIMBY reported on October 22. The filings include multiple demolition permits, a site work permit, a phased vertical construction permit and a master construction permit.

The vertical, site work and master permits remain pending approval. Until they are issued, they do not authorize vertical work. Mobius Construction Inc. is listed as general contractor on the filings.

The demolition permits cover more than a dozen low-rise retail, office and commercial structures on the T5-O zoned site. Demolition and construction are expected to start within the next few months, according to Floridian Development. Completion is targeted for 2030.

Plans submitted to the Urban Development Review Board call for two buildings of 12 and 24 stories, rising 185 and 309 feet. They hold 143 condominium residences, an 85-key hotel and 20 condo-hotel units, plus more than 50,000 square feet of ground-floor retail and 178 parking spaces on one basement level. David Chipperfield Architects and CUBE 3 are the architects. RDAI is designing more than 40,000 square feet of residential amenity space. Residences run one to four bedrooms plus penthouses, priced from $1.8 million.

The joint venture pairs Constellation Hotels Holding, Raycliff Capital, Miami Design District Associates and Fort Partners. The group assembled the site for about $170 million in late 2022.

Address
3995 North Miami Avenue, Miami, FL 33127 (also 39 NE 39th St, Miami, FL 33137)
Units
143
Floors
24
Height
309 ft
Sq ft
611,839
Completion
2030

Every filing, company, change and story we have on this project, approved as of our latest read of the record.

The Miami Brief · free

Every new Miami project, in your inbox at 8.

Read from the permits and filings each morning and written up as news. Free.

Free · unsubscribe anytime · no spam, just projects

Groundbreak covers 9 markets

  1. 1

    EastGroup Proposes 371K SF Logistics Center in Hialeah

  2. 2

    Doral Marketplace Trades for $83M

  3. 3

    Miami Beach Denies 38-Story Live Local Towers at 910 West Avenue

  4. 4

    540-Unit, 50-Story Mixed-Use Tower Proposed for Edgewater

  5. 5

    CMU Proposes 35-Acre Miami Campus at Former Mana Wynwood Site

More from Miami

All coverage ↗